Stucco
and a Visit to the Tile Store |
||
The
ladies picked tile for their floors, bathroom and kitchen counter
tops. Two chose the upper color, and two picked the other. I
was surprised that they all went for the same pattern. |
||
Manolo
insisted that he did not need scaffolding to do the parapet. That
ledge is only about 15" wide. The roof cap is complete and the sealing man should begin soon, probably after the holidays. |
||
PROJECT COST SUMMARY TO DATE |
||||
Stuff and Things -- |
Dollars at 9:1 | Pesos | ||
Material |
$ 1,385 |
$ 12,465 |
||
Labor |
3,256 |
29,304 |
||
Total Stuff and Things |
4,977 |
44,789 |
||
Continuing Phases | ||||
These 5 items are (will be) material only. Labor will be provided by the family and me. |
Electrical |
3,507 |
31,564 |
|
Plumbing |
645 |
5,882 |
||
Iron Work |
2,127 |
19,140 |
||
Tile |
5,128 |
46,151 |
||
Paint |
||||
These 4 items are (will be) material and labor. |
Air Conditioning |
3,318 |
29,860 |
|
Cabinetry |
2,044 |
18,400 |
||
Plaster |
4,883 |
43,944 |
||
Stucco |
1,953 |
17,587 |
||
|
||||
Social Security payments |
4,520 |
40,677 |
||
|
||||
Previous Phases: |
||||
North Roof |
5,819 |
52,375 |
||
South Roof & Stairs |
4,964 |
44,674 |
||
North 2nd Floor Shell |
3,812 |
34,310 |
||
North 2nd Floor Slab |
4,077 |
36,692 |
||
South 2nd Floor Shell |
4,759 |
42,828 |
||
South 2nd Floor Slab |
4,514 |
40,630 |
||
South 1st Floor Shell |
6,934 |
62,406 |
||
The cost of the form lumber has not been included because it has considerable re-sale value. Its net cost will be included later. |
North 1st Floor Shell |
7,692 |
69,228 |
|
Property Walls |
6,535 |
58,815 |
||
Property Purchase |
24,003 |
216,208 |
||
PROJECT TOTAL on 12/21 |
$ 106,218 |
$ 955,966 |