Plaster, Kitchens and Stuff 
and 16 November 02 Update
 

The plaster people have started.  We have two crews -- two brothers and their two sons. Each crew is doing a separate house.  Each house will take about two weeks to complete.  
 
They do all the make-ready work -- filling in holes, chipping away concrete runs, etc.  But what a mess they leave on the floor.

The labor cost is $25 pesos (USD $2.50) per square meter which adds up to about USD $1,000 per house plus the cost of the plaster.

The plasterer's labor cost is based on the gross area of the walls and ceiling; no deduction is made for the areas of windows and doors.  The rational is that the labor involved in making the neat square returns around doors and windows is equal to or greater than the labor of a flat wall.  After watching the work, I agree.  It is a fair way to charge.

It sure looks nice with all the ugly concrete and brick work covered up.

 

This is the brick shell for the kitchen base cabinets. The top will be tile. Wooden cabinets and drawers will be inserted under the concrete tops.

My original plan called for a space of 3'- 6" between the wall unit and the island, but the ladies wanted a space large enough for 3 or 4 to work for large parties, so now the spacing is 5'- 6"

The stove goes in front of the window, which allows the A/C to blow the cooking heat out the window.

Air conditioning work continues in the north house.

The junior cleaning crew -- good enthusiasm but short attention span.  They're still young enough to think it's great fun to work on their houses. 

 

 

 

PROJECT COST SUMMARY TO DATE
in US dollars converted from Mexican pesos at 9:1
 

Stuff and Things -- Finishing Up

Material

$ 110

Labor

578

Total Stuff and Things -- 11/16

$688

 
Continuing Phases

Electrical 

2,374

These five items are (will be) material only, Labor will be provided by the family and me.

Plumbing 

510

Iron Work

2,071

Tile

Paint

Air Conditioning

1,220

These four items are (will be) material and labor.

Cabinetry 

1.511

Plaster

1,142

Stucco

541

  

Social Security payments

4,235

 

Previous Phases:

North Roof

5,728

South Roof & Stairs

4,964

North 2nd Floor Shell

4,077

North 2nd Floor Slab

4,077

South 2nd Floor Shell

4,759

South 2nd Floor Slab

4,514

South 1st Floor Shell

6,934

The cost of the form lumber has not been included because it has con-siderable re-sale value.  Its net cost will be included later.

North 1st Floor Shell

7,692

Property Walls

6,808

Property Purchase

24,003

PROJECT TOTAL on 11/16

$ 87,674