Plumbing
and Patio 08 March 03 Update |
||
Enrique
and Rubin are hooking up the water tanks and pressure pumps on the
roof. Air conditioners are next. |
||
Iniz is laying the interlocking brick pavers on the patio. |
||
We prepared
the ground by removing all the concrete mixing residue, adding fill dirt
were needed, and then compacting the soil. Then we brought in 4 to 6
inches of sand to form a bed for the bricks. When all the
bricks are in place, more sand will be brushed into the spaces between. |
||
Here are some views from the roof. | ||
There are mountains and a river to the south and west, but only flat desert lies to the north and east. Lerdo is where the desert meets the mountains. Though not very clear in these pictures, Lerdo extends a little way up the western mountains.
|
||
Looking west and northwest |
||
Looking south and southwest |
Northeast toward downtown |
|
PROJECT COST SUMMARY TO DATE |
||||
Stuff and Things -- |
Dollars at 10:1 | Pesos | ||
Material |
$ 1,438 |
$ 14,376 |
||
Labor |
3,246 |
32,455 |
||
Total Stuff and Things |
4,683 |
46,831 |
||
Continuing Phases | ||||
These 3 items are (will be) material only. Labor will be provided by the family and me. |
Electrical |
3,398 |
33,984 |
|
Plumbing |
2,183 |
21,828 |
||
Iron Work |
2,527 |
25,272 |
||
Cabinetry |
3,740 |
37,395 |
||
Window Glass |
900 |
9,000 |
||
Paint, inside |
696 | 6.957 | ||
Tile |
4,881 |
48,805 |
||
Patio Brick Work |
1,303 | 13,025 | ||
|
||||
Social Security payments |
5,027 |
50,268 |
||
Form Lumber |
1,975 |
19,754 |
||
Previous Phases: |
||||
Air Conditioning |
3,130 |
31,302 |
||
Plaster |
5,642 |
56,419 |
||
Stucco |
5,328 |
53,275 |
||
Paint, outside |
2,867 | 28,866 | ||
Roof Sealing |
948 | 9,476 | ||
North Roof |
5,238 |
52,375 |
||
South Roof & Stairs |
4,467 |
44,674 |
||
North 2nd Floor Shell |
3,431 |
34,310 |
||
North 2nd Floor Slab |
3,669 |
36,692 |
||
South 2nd Floor Shell |
4,282 |
42,828 |
||
|
South 2nd Floor Slab |
4,063 |
40,630 |
|
South 1st Floor Shell |
6,241 |
62,406 |
||
North 1st Floor Shell |
6,923 |
69,228 |
||
Property Walls |
5,882 |
58,815 |
||
Property Purchase |
21,621 |
216,208 |
||
PROJECT TOTAL 03/08/03 |
$ 114,945 |
$ 1,149,446 |