Plumbing and Patio
08 March 03 Update

Enrique and Rubin are hooking up the water tanks and pressure pumps on the roof.  Air conditioners are next.
 
The tanks will be filled each night.  There is not enough water pressure to raise to water to the roof during high usage periods -- which is most of the day.  Each apartment has its own pump and tank.

Iniz is laying the interlocking brick pavers on the patio.  

We prepared the ground by removing all the concrete mixing residue, adding fill dirt were needed, and then compacting the soil.  Then we brought in 4 to 6 inches of sand to form a bed for the bricks.  When all the bricks are in place, more sand will be brushed into the spaces between. 
 
This brickwork will extend all the way around the house except for the walkway at the north end where there will be sand but no bricks so the kids can play in the sand.  (Requested by the boys.  The mothers are not too thrilled; I voted with the boys.)

Here are some views from the roof.

There are mountains and a river to the south and west, but only flat desert lies to the north and east.  Lerdo is where the desert meets the mountains. 

Though not very clear in these pictures, Lerdo extends a little way up the western mountains.

 

Looking west and northwest

Looking south and southwest

Northeast toward downtown

 

PROJECT COST SUMMARY TO DATE
 

Stuff and Things -- 
Finishing Up  03/08/2003

Dollars at 10:1 Pesos

Material

$ 1,438

$ 14,376

Labor

3,246

32,455

Total Stuff and Things

4,683

 46,831

 

Continuing Phases

These 3 items are (will be) material only.  Labor will be provided by the family and me.

Electrical 

3,398

33,984

Plumbing 

2,183

21,828

Iron Work

2,527

25,272

Cabinetry 

3,740

37,395

Window Glass

900

9,000

Paint, inside

696 6.957

Tile

4,881

48,805

Patio Brick Work

1,303 13,025

 

Social Security payments

5,027

50,268

Form Lumber

1,975

19,754

Previous Phases:

Air Conditioning

3,130

31,302

Plaster

5,642

56,419

Stucco

5,328

53,275

Paint, outside

2,867 28,866

Roof Sealing

948 9,476

North Roof

5,238

52,375

South Roof & Stairs

4,467

44,674

North 2nd Floor Shell

3,431

34,310

North 2nd Floor Slab

3,669

36,692

South 2nd Floor Shell

4,282

42,828

South 2nd Floor Slab

4,063

40,630

South 1st Floor Shell

6,241

62,406

North 1st Floor Shell

6,923

69,228

Property Walls

5,882

58,815

Property Purchase

21,621

216,208

PROJECT TOTAL   03/08/03

$ 114,945

  $ 1,149,446